Implementation of internal hydrant network from galvanized pipes, installation and connection of hydrants, supply and installation of high-pressure filling pump and centrifugal fire pump, installation of Gallus filling and discharge station of the hydrant network.
Relocation and installation of gas radiators of 20 and 40 kW, conversion of the existing natural gas distribution and connection of radiators, installation of a gas boiler for room heating of 26 kW, chimney installation, boiler connection and start-up.