{"id":3429,"date":"2021-05-12T12:12:20","date_gmt":"2021-05-12T12:12:20","guid":{"rendered":"https:\/\/energoconsulting.si\/projekti\/engineering-and-energy-consulting-various-clients\/"},"modified":"2022-03-31T06:23:44","modified_gmt":"2022-03-31T06:23:44","slug":"engineering-and-energy-consulting-various-clients","status":"publish","type":"portfolio","link":"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/","title":{"rendered":"Engineering and energy consulting \u2013 various clients"},"content":{"rendered":"<p>Preparing plans for mechanical installations and equipment during the phases of gaining a building permit, preparing a project for execution and preparing documentation on executed projects for reconstructions and new constructions:<\/p>\n<h4>Boiler rooms<\/h4>\n<ul>\n<li>Gas boiler room Ecolab Maribor, Slovenia, rated power 1,040 kW;<\/li>\n<li>Gas boiler room Trubarjeva 6, Maribor, Slovenia, rated power 123kW;<\/li>\n<li>Gas boiler room Mlekarni\u0161ka 2-14, Maribor, Slovenia, rated power 600 kW;<\/li>\n<li>Steam boiler room Mlinopek, steam production in a low-pressure steam boiler, capacity 300 kg\/h;<\/li>\n<li>Novo mesto printing house, Slovenia \u2013 rated power 150kW;<\/li>\n<li>Steam boiler room Euro-Vrt Ptuj, Slovenia, technological steam production, D = 1,000 kg\/h.<\/li>\n<li>Bevkova gas boiler room, rated power 2,000 kW<\/li>\n<li>Lackova gas boiler room, rated power 250 kW<\/li>\n<li>City gas boiler room, rated power 1.280 kW<\/li>\n<li>Grammer gas boiler room, Slovenj Gradec, rated power 560 kW<\/li>\n<\/ul>\n<h4>Heat stations<\/h4>\n<ul>\n<li>Heat station in the district heating system of Energetika Maribor, TOP 106 \u2013 project for reducing the connected power of space heating from 564 to 291 kW;<\/li>\n<li>Borova vas 3-7, TOP 407 \u2013 reconstruction of a heat station with nominal power for space heating 240kW, flow system for sanitary hot water 152kW;<\/li>\n<li>Gosposvetska 11-19, transition from a common gas boiler room to a district heating system, rated power for space heating 580kW;<\/li>\n<li>Cesta proletarskih brigad 57-67, TOP 207, reconstruction of a heat station with rated power for space heating 1.700kW, battery system for sanitary hot water 350 kW;<\/li>\n<li>Knafel\u010deva 30-34, TOP 105 \u2013 project to reduce the connected power of space heating from 660 to 290 kW.<\/li>\n<li>Gori\u0161ka 17-19\u2013 reconstruction of a heat station with nominal power for space heating 348 kW<\/li>\n<li>Gori\u0161ka 20-22\u2013 reconstruction of a heat station with nominal power for space heating 175 kW<\/li>\n<li>Gori\u0161ka 16-18\u2013 reconstruction of a heat station with nominal power for space heating 172 kW<\/li>\n<li>Gori\u0161ka 2-8\u2013 reconstruction of a heat station with nominal power for space heating 357 kW<\/li>\n<li>Gori\u0161ka 7-13\u2013 reconstruction of a heat station with nominal power for space heating 440 kW<\/li>\n<li>Gori\u0161ka 3-5\u2013 reconstruction of a heat station with nominal power for space heating 149 kW<\/li>\n<li>Ljubljanska 86\u2013 reconstruction of a heat station with nominal power for space heating 216 kW<\/li>\n<li>Ljubljanska 94\u2013 reconstruction of a heat station with nominal power for space heating 370 kW<\/li>\n<li>Ljubljanska 88\u2013 reconstruction of a heat station with nominal power for space heating 371 kW<\/li>\n<li>Ljubljanska 1\u2013 reconstruction of a heat station with nominal power for space heating 213 kW<\/li>\n<li>Ljubljanska 15\u2013 reconstruction of a heat station with nominal power for space heating 134 kW<\/li>\n<li>Staneta Severja 12-16\u2013 reconstruction of a heat station with nominal power for space heating 220 kW, sanitary hot water 130kW<\/li>\n<li>Ple\u010dnikova 1 \u2013 reconstruction of a heat station with nominal power for space heating 195 kW<\/li>\n<li>Ple\u010dnikova 3 \u2013 reconstruction of a heat station with nominal power for space heating 194 kW<\/li>\n<li>Ple\u010dnikova 5 \u2013 reconstruction of a heat station with nominal power for space heating 193 kW<\/li>\n<li>Ple\u010dnikova 7 \u2013 reconstruction of a heat station with nominal power for space heating 159 kW<\/li>\n<li>Ple\u010dnikova 9 \u2013 reconstruction of a heat station with nominal power for space heating 154 kW<\/li>\n<li>Ple\u010dnikova 2-4 \u2013 reconstruction of a heat station with nominal power for space heating 129 kW<\/li>\n<li>Ple\u010dnikova 6-8 \u2013 reconstruction of a heat station with nominal power for space heating OGP 118 kW<\/li>\n<li>Ple\u010dnikova 11-15 \u2013 reconstruction of a heat station with nominal power for space heating OGP 130 kW<\/li>\n<li>Ljubljanska 15 AB \u2013 reconstruction of a heat station with nominal power for space heating OGP 287 kW<\/li>\n<li>Ljubljanska 17 AB \u2013 reconstruction of a heat station with nominal power for space heating OGP 327 kW<\/li>\n<li>Ljubljanska 19 AB \u2013 reconstruction of a heat station with nominal power for space heating OGP 249 kW<\/li>\n<li>Ljubljanska 25 AB \u2013 reconstruction of a heat station with nominal power for space heating OGP 319 kW<\/li>\n<li>Ljubljanska 27 AB \u2013 reconstruction of a heat station with nominal power for space heating OGP 316 kW<\/li>\n<li>Ljubljanska 29-33 \u2013 reconstruction of a heat station with nominal power for space heating OGP 127 kW<\/li>\n<\/ul>\n<h4>Cogeneration of heat and electricity<\/h4>\n<ul>\n<li>Novo mesto printing house, Slovenia \u2013 installation of a cogeneration unit (CHP) 50 kWe, 100kWt;<\/li>\n<li>Hotel Habakuk, Maribor, Slovenia \u2013 installation of 3 cogeneration units (CHP) 50 kWe, 100kWt;<\/li>\n<li>Casino Mond, \u0160entilj, Slovenia \u2013 installation of a cogeneration unit (CHP) 220 kWe, 253kWt;<\/li>\n<li>Hotel Orel, Maribor, Slovenia \u2013 installation of a cogeneration unit (CHP) 50 kWe, 100kWt;<\/li>\n<li>Son\u010dni dom (home for the elderly), \u017deleznikova ulica 10, Maribor, Slovenia \u2013 installation of a cogeneration unit (CHP): 50 kWe, 81kWt; CHP 2: 20 kWe, 39kWt.<\/li>\n<\/ul>\n<h4>Hydraulic arrangement of the central heating system<\/h4>\n<ul>\n<li>Hydraulic balancing project of central heating; Ulica 14. divizije 54, Roga\u0161ka Slatina, Slovenia: multi-apartment building, 27 apartments, 102 radiators, 14 feed pipes, system with installation of pressure-independent valves to radiators;<\/li>\n<li>Hydraulic balancing project of central heating Mlekarni\u0161ka 2-14, Maribor, Slovenia: multi-apartment building, 105 apartments, 535 radiators, 61 feed pipes, system with installation of pressure-independent valves to radiators;<\/li>\n<li>Hydraulic balancing project of central heating Re\u0161ka 1-5, 33-37, Tbilisijska 20-26, 28-32 and 42-48, Ljubljana, Slovenia: multi-apartment buildings, a total of 212 apartments, 926 radiators, a system with the installation of pressure-independent valves to radiators.<\/li>\n<li>Hydraulic balancing project Bevkova 1, 3, 4-6, Ruska 15-17, \u0160ercerjevih Brigad 58-64, 66-72, Maribor, multi-apartment buildings, a total of 478 apartments, 306 risers, a system with the installation of flow regulators and differential pressure difference regulators on rising waters.<\/li>\n<li>Trubarjeva 6, Mb \u2013 11 risers \u2013 pressure independent regulators and flow limitation.<\/li>\n<\/ul>\n<h4>Industry \/ technology<\/h4>\n<ul>\n<li>Mechanical installations and technological plan for drying Ca butyrate and grinding line at the company TANIN SEVNICA Kemi\u010dna industrija d.d., Slovenia;<\/li>\n<li>Gasification of the Mlinopek bakery in Murska Sobota, Slovenia;<\/li>\n<li>Ventilation of production and storage rooms at the company V-TISK, ventilation system capacity 22,000 m<sup>3<\/sup>\/h, heat pump with heat\/cooling power 103\/103 kW;<\/li>\n<li>Supply of Ca butyrate production with technological steam at the company TANIN SEVNICA Kemi\u010dna industrija d.d., Slovenia;<\/li>\n<li>Supply of Ca butyrate production with technological steam at the company TANIN SEVNICA Kemi\u010dna industrija d.d., Slovenia;<\/li>\n<li>Mechanical installations and technological project Eurovrt Ptuj, Slovenia. Facility heating\/cooling with air to water heat pump, with nominal power 55 kW, ventilation device 3,500 m <sup>3<\/sup> \/ h air, compressed air capacity 670 l\/min, p <sub>max<\/sub>= 11 bar;<\/li>\n<li>Suction of Symex mixer technology, Henkel, Slovenia.<\/li>\n<li>Henkel \u2013 ventilation of production premises, ventilation capacity 7,000 m3\/h; cooling 92 kW, heating 50 kW.<\/li>\n<li>LPG (liquefied petroleum gas) Eurovrt control station 100 kg\/h<\/li>\n<li>Evaporation station LPG Benica 200 kg\/h<\/li>\n<li>University Medical Centre Maribor \u2013 reconstruction of the cooling system and cold water pump station. Rated cooling power 2,550 kW.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Preparing plans for mechanical installations and equipment during the phases of gaining a building permit, preparing a project for execution and preparing documentation on executed projects for reconstructions and new constructions: Boiler rooms Gas boiler room Ecolab Maribor, Slovenia, rated power 1,040 kW; Gas boiler room Trubarjeva 6, Maribor, Slovenia, rated power 123kW; Gas boiler [&hellip;]<\/p>\n","protected":false},"featured_media":3433,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"portfolio_cat":[49],"portfolio_skills":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Engineering and energy consulting \u2013 various clients - Energoconsulting, d.o.o.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Engineering and energy consulting \u2013 various clients - Energoconsulting, d.o.o.\" \/>\n<meta property=\"og:description\" content=\"Preparing plans for mechanical installations and equipment during the phases of gaining a building permit, preparing a project for execution and preparing documentation on executed projects for reconstructions and new constructions: Boiler rooms Gas boiler room Ecolab Maribor, Slovenia, rated power 1,040 kW; Gas boiler room Trubarjeva 6, Maribor, Slovenia, rated power 123kW; Gas boiler [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/\" \/>\n<meta property=\"og:site_name\" content=\"Energoconsulting, d.o.o.\" \/>\n<meta property=\"article:modified_time\" content=\"2022-03-31T06:23:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.energoconsulting.si\/nova\/wp-content\/uploads\/2020\/01\/projektiranje1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"500\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/\",\"url\":\"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/\",\"name\":\"Engineering and energy consulting \u2013 various clients - Energoconsulting, d.o.o.\",\"isPartOf\":{\"@id\":\"https:\/\/energoconsulting.si\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/energoconsulting.si\/nova\/wp-content\/uploads\/2020\/01\/projektiranje1.jpg\",\"datePublished\":\"2021-05-12T12:12:20+00:00\",\"dateModified\":\"2022-03-31T06:23:44+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/#primaryimage\",\"url\":\"https:\/\/energoconsulting.si\/nova\/wp-content\/uploads\/2020\/01\/projektiranje1.jpg\",\"contentUrl\":\"https:\/\/energoconsulting.si\/nova\/wp-content\/uploads\/2020\/01\/projektiranje1.jpg\",\"width\":500,\"height\":500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/energoconsulting.si\/en\/home\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"projects\",\"item\":\"https:\/\/energoconsulting.si\/en\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Engineering and energy consulting \u2013 various clients\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/energoconsulting.si\/en\/#website\",\"url\":\"https:\/\/energoconsulting.si\/en\/\",\"name\":\"Energoconsulting, d.o.o.\",\"description\":\"Strojni in\u017eeniring\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/energoconsulting.si\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Engineering and energy consulting \u2013 various clients - Energoconsulting, d.o.o.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/","og_locale":"en_US","og_type":"article","og_title":"Engineering and energy consulting \u2013 various clients - Energoconsulting, d.o.o.","og_description":"Preparing plans for mechanical installations and equipment during the phases of gaining a building permit, preparing a project for execution and preparing documentation on executed projects for reconstructions and new constructions: Boiler rooms Gas boiler room Ecolab Maribor, Slovenia, rated power 1,040 kW; Gas boiler room Trubarjeva 6, Maribor, Slovenia, rated power 123kW; Gas boiler [&hellip;]","og_url":"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/","og_site_name":"Energoconsulting, d.o.o.","article_modified_time":"2022-03-31T06:23:44+00:00","og_image":[{"width":500,"height":500,"url":"https:\/\/www.energoconsulting.si\/nova\/wp-content\/uploads\/2020\/01\/projektiranje1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/","url":"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/","name":"Engineering and energy consulting \u2013 various clients - Energoconsulting, d.o.o.","isPartOf":{"@id":"https:\/\/energoconsulting.si\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/#primaryimage"},"image":{"@id":"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/#primaryimage"},"thumbnailUrl":"https:\/\/energoconsulting.si\/nova\/wp-content\/uploads\/2020\/01\/projektiranje1.jpg","datePublished":"2021-05-12T12:12:20+00:00","dateModified":"2022-03-31T06:23:44+00:00","breadcrumb":{"@id":"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/#primaryimage","url":"https:\/\/energoconsulting.si\/nova\/wp-content\/uploads\/2020\/01\/projektiranje1.jpg","contentUrl":"https:\/\/energoconsulting.si\/nova\/wp-content\/uploads\/2020\/01\/projektiranje1.jpg","width":500,"height":500},{"@type":"BreadcrumbList","@id":"https:\/\/energoconsulting.si\/en\/projects\/engineering-and-energy-consulting-various-clients\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energoconsulting.si\/en\/home\/"},{"@type":"ListItem","position":2,"name":"projects","item":"https:\/\/energoconsulting.si\/en\/projects\/"},{"@type":"ListItem","position":3,"name":"Engineering and energy consulting \u2013 various clients"}]},{"@type":"WebSite","@id":"https:\/\/energoconsulting.si\/en\/#website","url":"https:\/\/energoconsulting.si\/en\/","name":"Energoconsulting, d.o.o.","description":"Strojni in\u017eeniring","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energoconsulting.si\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/energoconsulting.si\/en\/wp-json\/wp\/v2\/portfolio\/3429"}],"collection":[{"href":"https:\/\/energoconsulting.si\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/energoconsulting.si\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"replies":[{"embeddable":true,"href":"https:\/\/energoconsulting.si\/en\/wp-json\/wp\/v2\/comments?post=3429"}],"version-history":[{"count":2,"href":"https:\/\/energoconsulting.si\/en\/wp-json\/wp\/v2\/portfolio\/3429\/revisions"}],"predecessor-version":[{"id":3777,"href":"https:\/\/energoconsulting.si\/en\/wp-json\/wp\/v2\/portfolio\/3429\/revisions\/3777"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energoconsulting.si\/en\/wp-json\/wp\/v2\/media\/3433"}],"wp:attachment":[{"href":"https:\/\/energoconsulting.si\/en\/wp-json\/wp\/v2\/media?parent=3429"}],"wp:term":[{"taxonomy":"portfolio_cat","embeddable":true,"href":"https:\/\/energoconsulting.si\/en\/wp-json\/wp\/v2\/portfolio_cat?post=3429"},{"taxonomy":"portfolio_skills","embeddable":true,"href":"https:\/\/energoconsulting.si\/en\/wp-json\/wp\/v2\/portfolio_skills?post=3429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}