- Modification of the ventilation system of the AF turbine pump (VA72763).
Preparation of project documentation, equipment purchase, installation and startup of a new ventilation system of the TDAF pump room. - Execution of mechanical installations as part of the modification of the ventilation of the low-level radioactive waste storage facility at the Krško Nuclear Power Plant (in cooperation with the company NUMIP).
- Implementation of the ventilation and cooling system during the installation of the diesel generator 3 in the Krško Nuclear Power Plant (in cooperation with the company NUMIP).
- Mechanical installations – plumbing, fire protection, ventilation and heating for the equipment Storage at the Krško NPP (in cooperation with the company CGP Kolektor).
- Installation of HVAC equipment (mod.1024-BS-L) on the Krško Nuclear Power Plant (NEK), Upgrades project, phase 3 engineering, design and construction of BB2 at the Krško Nuclear Power Plant (NEK).