projects - Engineering and energy consulting – various clients

Engineering and energy consulting – various clients


Projekt Description

Preparing plans for mechanical installations and equipment during the phases of gaining a building permit, preparing a project for execution and preparing documentation on executed projects for reconstructions and new constructions:

Boiler rooms

  • Gas boiler room Ecolab Maribor, Slovenia, rated power 1,040 kW;
  • Gas boiler room Trubarjeva 6, Maribor, Slovenia, rated power 123kW;
  • Gas boiler room Mlekarniška 2-14, Maribor, Slovenia, rated power 600 kW;
  • Steam boiler room Mlinopek, steam production in a low-pressure steam boiler, capacity 300 kg/h;
  • Novo mesto printing house, Slovenia – rated power 150kW;
  • Steam boiler room Euro-Vrt Ptuj, Slovenia, technological steam production, D = 1,000 kg/h.
  • Bevkova gas boiler room, rated power 2,000 kW
  • Lackova gas boiler room, rated power 250 kW
  • City gas boiler room, rated power 1.280 kW
  • Grammer gas boiler room, Slovenj Gradec, rated power 560 kW

Heat stations

  • Heat station in the district heating system of Energetika Maribor, TOP 106 – project for reducing the connected power of space heating from 564 to 291 kW;
  • Borova vas 3-7, TOP 407 – reconstruction of a heat station with nominal power for space heating 240kW, flow system for sanitary hot water 152kW;
  • Gosposvetska 11-19, transition from a common gas boiler room to a district heating system, rated power for space heating 580kW;
  • Cesta proletarskih brigad 57-67, TOP 207, reconstruction of a heat station with rated power for space heating 1.700kW, battery system for sanitary hot water 350 kW;
  • Knafelčeva 30-34, TOP 105 – project to reduce the connected power of space heating from 660 to 290 kW.
  • Goriška 17-19– reconstruction of a heat station with nominal power for space heating 348 kW
  • Goriška 20-22– reconstruction of a heat station with nominal power for space heating 175 kW
  • Goriška 16-18– reconstruction of a heat station with nominal power for space heating 172 kW
  • Goriška 2-8– reconstruction of a heat station with nominal power for space heating 357 kW
  • Goriška 7-13– reconstruction of a heat station with nominal power for space heating 440 kW
  • Goriška 3-5– reconstruction of a heat station with nominal power for space heating 149 kW
  • Ljubljanska 86– reconstruction of a heat station with nominal power for space heating 216 kW
  • Ljubljanska 94– reconstruction of a heat station with nominal power for space heating 370 kW
  • Ljubljanska 88– reconstruction of a heat station with nominal power for space heating 371 kW
  • Ljubljanska 1– reconstruction of a heat station with nominal power for space heating 213 kW
  • Ljubljanska 15– reconstruction of a heat station with nominal power for space heating 134 kW
  • Staneta Severja 12-16– reconstruction of a heat station with nominal power for space heating 220 kW, sanitary hot water 130kW
  • Plečnikova 1 – reconstruction of a heat station with nominal power for space heating 195 kW
  • Plečnikova 3 – reconstruction of a heat station with nominal power for space heating 194 kW
  • Plečnikova 5 – reconstruction of a heat station with nominal power for space heating 193 kW
  • Plečnikova 7 – reconstruction of a heat station with nominal power for space heating 159 kW
  • Plečnikova 9 – reconstruction of a heat station with nominal power for space heating 154 kW
  • Plečnikova 2-4 – reconstruction of a heat station with nominal power for space heating 129 kW
  • Plečnikova 6-8 – reconstruction of a heat station with nominal power for space heating OGP 118 kW
  • Plečnikova 11-15 – reconstruction of a heat station with nominal power for space heating OGP 130 kW
  • Ljubljanska 15 AB – reconstruction of a heat station with nominal power for space heating OGP 287 kW
  • Ljubljanska 17 AB – reconstruction of a heat station with nominal power for space heating OGP 327 kW
  • Ljubljanska 19 AB – reconstruction of a heat station with nominal power for space heating OGP 249 kW
  • Ljubljanska 25 AB – reconstruction of a heat station with nominal power for space heating OGP 319 kW
  • Ljubljanska 27 AB – reconstruction of a heat station with nominal power for space heating OGP 316 kW
  • Ljubljanska 29-33 – reconstruction of a heat station with nominal power for space heating OGP 127 kW

Cogeneration of heat and electricity

  • Novo mesto printing house, Slovenia – installation of a cogeneration unit (CHP) 50 kWe, 100kWt;
  • Hotel Habakuk, Maribor, Slovenia – installation of 3 cogeneration units (CHP) 50 kWe, 100kWt;
  • Casino Mond, Šentilj, Slovenia – installation of a cogeneration unit (CHP) 220 kWe, 253kWt;
  • Hotel Orel, Maribor, Slovenia – installation of a cogeneration unit (CHP) 50 kWe, 100kWt;
  • Sončni dom (home for the elderly), Železnikova ulica 10, Maribor, Slovenia – installation of a cogeneration unit (CHP): 50 kWe, 81kWt; CHP 2: 20 kWe, 39kWt.

Hydraulic arrangement of the central heating system

  • Hydraulic balancing project of central heating; Ulica 14. divizije 54, Rogaška Slatina, Slovenia: multi-apartment building, 27 apartments, 102 radiators, 14 feed pipes, system with installation of pressure-independent valves to radiators;
  • Hydraulic balancing project of central heating Mlekarniška 2-14, Maribor, Slovenia: multi-apartment building, 105 apartments, 535 radiators, 61 feed pipes, system with installation of pressure-independent valves to radiators;
  • Hydraulic balancing project of central heating Reška 1-5, 33-37, Tbilisijska 20-26, 28-32 and 42-48, Ljubljana, Slovenia: multi-apartment buildings, a total of 212 apartments, 926 radiators, a system with the installation of pressure-independent valves to radiators.
  • Hydraulic balancing project Bevkova 1, 3, 4-6, Ruska 15-17, Šercerjevih Brigad 58-64, 66-72, Maribor, multi-apartment buildings, a total of 478 apartments, 306 risers, a system with the installation of flow regulators and differential pressure difference regulators on rising waters.
  • Trubarjeva 6, Mb – 11 risers – pressure independent regulators and flow limitation.

Industry / technology

  • Mechanical installations and technological plan for drying Ca butyrate and grinding line at the company TANIN SEVNICA Kemična industrija d.d., Slovenia;
  • Gasification of the Mlinopek bakery in Murska Sobota, Slovenia;
  • Ventilation of production and storage rooms at the company V-TISK, ventilation system capacity 22,000 m3/h, heat pump with heat/cooling power 103/103 kW;
  • Supply of Ca butyrate production with technological steam at the company TANIN SEVNICA Kemična industrija d.d., Slovenia;
  • Supply of Ca butyrate production with technological steam at the company TANIN SEVNICA Kemična industrija d.d., Slovenia;
  • Mechanical installations and technological project Eurovrt Ptuj, Slovenia. Facility heating/cooling with air to water heat pump, with nominal power 55 kW, ventilation device 3,500 m 3 / h air, compressed air capacity 670 l/min, p max= 11 bar;
  • Suction of Symex mixer technology, Henkel, Slovenia.
  • Henkel – ventilation of production premises, ventilation capacity 7,000 m3/h; cooling 92 kW, heating 50 kW.
  • LPG (liquefied petroleum gas) Eurovrt control station 100 kg/h
  • Evaporation station LPG Benica 200 kg/h
  • University Medical Centre Maribor – reconstruction of the cooling system and cold water pump station. Rated cooling power 2,550 kW.