Preparing plans for mechanical installations and equipment during the phases of gaining a building permit, preparing a project for execution and preparing documentation on executed projects for reconstructions and new constructions:
Boiler rooms
- Gas boiler room Ecolab Maribor, Slovenia, rated power 1,040 kW;
- Gas boiler room Trubarjeva 6, Maribor, Slovenia, rated power 123kW;
- Gas boiler room Mlekarniška 2-14, Maribor, Slovenia, rated power 600 kW;
- Steam boiler room Mlinopek, steam production in a low-pressure steam boiler, capacity 300 kg/h;
- Novo mesto printing house, Slovenia – rated power 150kW;
- Steam boiler room Euro-Vrt Ptuj, Slovenia, technological steam production, D = 1,000 kg/h.
- Bevkova gas boiler room, rated power 2,000 kW
- Lackova gas boiler room, rated power 250 kW
- City gas boiler room, rated power 1.280 kW
- Grammer gas boiler room, Slovenj Gradec, rated power 560 kW
Heat stations
- Heat station in the district heating system of Energetika Maribor, TOP 106 – project for reducing the connected power of space heating from 564 to 291 kW;
- Borova vas 3-7, TOP 407 – reconstruction of a heat station with nominal power for space heating 240kW, flow system for sanitary hot water 152kW;
- Gosposvetska 11-19, transition from a common gas boiler room to a district heating system, rated power for space heating 580kW;
- Cesta proletarskih brigad 57-67, TOP 207, reconstruction of a heat station with rated power for space heating 1.700kW, battery system for sanitary hot water 350 kW;
- Knafelčeva 30-34, TOP 105 – project to reduce the connected power of space heating from 660 to 290 kW.
- Goriška 17-19– reconstruction of a heat station with nominal power for space heating 348 kW
- Goriška 20-22– reconstruction of a heat station with nominal power for space heating 175 kW
- Goriška 16-18– reconstruction of a heat station with nominal power for space heating 172 kW
- Goriška 2-8– reconstruction of a heat station with nominal power for space heating 357 kW
- Goriška 7-13– reconstruction of a heat station with nominal power for space heating 440 kW
- Goriška 3-5– reconstruction of a heat station with nominal power for space heating 149 kW
- Ljubljanska 86– reconstruction of a heat station with nominal power for space heating 216 kW
- Ljubljanska 94– reconstruction of a heat station with nominal power for space heating 370 kW
- Ljubljanska 88– reconstruction of a heat station with nominal power for space heating 371 kW
- Ljubljanska 1– reconstruction of a heat station with nominal power for space heating 213 kW
- Ljubljanska 15– reconstruction of a heat station with nominal power for space heating 134 kW
- Staneta Severja 12-16– reconstruction of a heat station with nominal power for space heating 220 kW, sanitary hot water 130kW
- Plečnikova 1 – reconstruction of a heat station with nominal power for space heating 195 kW
- Plečnikova 3 – reconstruction of a heat station with nominal power for space heating 194 kW
- Plečnikova 5 – reconstruction of a heat station with nominal power for space heating 193 kW
- Plečnikova 7 – reconstruction of a heat station with nominal power for space heating 159 kW
- Plečnikova 9 – reconstruction of a heat station with nominal power for space heating 154 kW
- Plečnikova 2-4 – reconstruction of a heat station with nominal power for space heating 129 kW
- Plečnikova 6-8 – reconstruction of a heat station with nominal power for space heating OGP 118 kW
- Plečnikova 11-15 – reconstruction of a heat station with nominal power for space heating OGP 130 kW
- Ljubljanska 15 AB – reconstruction of a heat station with nominal power for space heating OGP 287 kW
- Ljubljanska 17 AB – reconstruction of a heat station with nominal power for space heating OGP 327 kW
- Ljubljanska 19 AB – reconstruction of a heat station with nominal power for space heating OGP 249 kW
- Ljubljanska 25 AB – reconstruction of a heat station with nominal power for space heating OGP 319 kW
- Ljubljanska 27 AB – reconstruction of a heat station with nominal power for space heating OGP 316 kW
- Ljubljanska 29-33 – reconstruction of a heat station with nominal power for space heating OGP 127 kW
Cogeneration of heat and electricity
- Novo mesto printing house, Slovenia – installation of a cogeneration unit (CHP) 50 kWe, 100kWt;
- Hotel Habakuk, Maribor, Slovenia – installation of 3 cogeneration units (CHP) 50 kWe, 100kWt;
- Casino Mond, Šentilj, Slovenia – installation of a cogeneration unit (CHP) 220 kWe, 253kWt;
- Hotel Orel, Maribor, Slovenia – installation of a cogeneration unit (CHP) 50 kWe, 100kWt;
- Sončni dom (home for the elderly), Železnikova ulica 10, Maribor, Slovenia – installation of a cogeneration unit (CHP): 50 kWe, 81kWt; CHP 2: 20 kWe, 39kWt.
Hydraulic arrangement of the central heating system
- Hydraulic balancing project of central heating; Ulica 14. divizije 54, Rogaška Slatina, Slovenia: multi-apartment building, 27 apartments, 102 radiators, 14 feed pipes, system with installation of pressure-independent valves to radiators;
- Hydraulic balancing project of central heating Mlekarniška 2-14, Maribor, Slovenia: multi-apartment building, 105 apartments, 535 radiators, 61 feed pipes, system with installation of pressure-independent valves to radiators;
- Hydraulic balancing project of central heating Reška 1-5, 33-37, Tbilisijska 20-26, 28-32 and 42-48, Ljubljana, Slovenia: multi-apartment buildings, a total of 212 apartments, 926 radiators, a system with the installation of pressure-independent valves to radiators.
- Hydraulic balancing project Bevkova 1, 3, 4-6, Ruska 15-17, Šercerjevih Brigad 58-64, 66-72, Maribor, multi-apartment buildings, a total of 478 apartments, 306 risers, a system with the installation of flow regulators and differential pressure difference regulators on rising waters.
- Trubarjeva 6, Mb – 11 risers – pressure independent regulators and flow limitation.
Industry / technology
- Mechanical installations and technological plan for drying Ca butyrate and grinding line at the company TANIN SEVNICA Kemična industrija d.d., Slovenia;
- Gasification of the Mlinopek bakery in Murska Sobota, Slovenia;
- Ventilation of production and storage rooms at the company V-TISK, ventilation system capacity 22,000 m3/h, heat pump with heat/cooling power 103/103 kW;
- Supply of Ca butyrate production with technological steam at the company TANIN SEVNICA Kemična industrija d.d., Slovenia;
- Supply of Ca butyrate production with technological steam at the company TANIN SEVNICA Kemična industrija d.d., Slovenia;
- Mechanical installations and technological project Eurovrt Ptuj, Slovenia. Facility heating/cooling with air to water heat pump, with nominal power 55 kW, ventilation device 3,500 m 3 / h air, compressed air capacity 670 l/min, p max= 11 bar;
- Suction of Symex mixer technology, Henkel, Slovenia.
- Henkel – ventilation of production premises, ventilation capacity 7,000 m3/h; cooling 92 kW, heating 50 kW.
- LPG (liquefied petroleum gas) Eurovrt control station 100 kg/h
- Evaporation station LPG Benica 200 kg/h
- University Medical Centre Maribor – reconstruction of the cooling system and cold water pump station. Rated cooling power 2,550 kW.