Installation of a new gas boiler with a power of 280 kW, installation of pipes and connection of the boiler to the heating system, arrangement of the boiler room.
Hydraulic balancing Mlekarniška
Implementation of hydraulic balancing of the heating system of a multi-apartment building by replacing existing radiator valves with pressure-independent valves with presetting and installation of thermostatic heads on all radiators in apartments.
CITY refrigeration units – replacement of worn-out refrigeration units in TPC City, 2x HA Daikin EWAT-B, cooling capacity 2x 386 kW.
TOP 611-Šilihova – renovation/reconstruction (2 stations).